CLIENT: Client City West Homes
TYPE OF ORGANIZATION:Council
LOCATION: Churchill Gardens Estate SW1
DESCRIPTION OF WORK: 6 No Blocks

  • Prepare & redecorate painted external elevations
  • Repair/prepare render, stucco, concrete wall finishes, rendered coatings
  • Concrete repairs to balconies, window cills, lintels, canopies, soffits
  • Redecoration and repairs to internal communal areas, upgrade of existing painted surfaces to Class’ O fire rating
CLIENT: City West Homes
TYPE OF ORGANIZATION:Council
LOCATION: Millbank Estate Westminster, London SW1P
DESCRIPTION OF WORK: 4 No Blocks

  • Prepare & redecorate painted external elevations
  • Concrete repairs to balconies, window cills, lintels, canopies, soffits
  • Redecoration and repairs to internal communal areas, upgrade of existing painted surfaces to Class’ O fire rating
PROJECT:Art Deco Building
PROJECT LOCATION:Dorset House, Marylebone Road, London, NW1 5AR
CLIENT: Killby & Gayford
DESCRIPTION OF WORK:

  • 100% Strip of all previously painted surfaces, Prepare & redecorate painted external elevations
  • Overall all Critall windows Repair/prepare render, stucco, concrete wall finishes
  • Concrete repairs to balconies, window cills, lintels, canopies, soffits
  • Redecoration and repairs to internal communal areas
PROJECT:Millenium Dome
PROJECT LOCATION:Greenwich London
CLIENT: Ellma Construction
DESCRIPTION PAINTING TO SHELL & CORE:

  • Intumescent fire protective coatings to internal/external steelwork, System S, S607 and TS616 top seal internal and S605 with TS615 top seal on external steel, spray applied Intumescent fire protective coatings.
PROJECT:Royal Lodge
CLIENT: Arkle Contracting Ltd
DESCRIPTION OF WORK:

  • Prepare & redecorate painted external elevations, application of Kiem Mineral Paint
  • Repair/prepare render, stucco, concrete wall finishes, rendered coatings
  • Concrete repairs to balconies, window cills, lintels, canopies, soffits
PROJECT:Royal Albert Hall Kensington Gore London SW7 2AP
CLIENT: Arkle Contracting Ltd
DESCRIPTION OF WORK:

  • Internal Decorations, Intricate specialist finishes, including, French Polishing, Clean & Revive, Rag Rolling, Marbling, and Stenciling
PROJECT:Royal Lodge
CLIENT: Arkle Contracting Ltd
DESCRIPTION OF WORK:

  • Prepare & redecorate painted external elevations, application of Kiem Mineral Paint
  • Repair/prepare render, stucco, concrete wall finishes, rendered coatings
  • Concrete repairs to balconies, window cills, lintels, canopies, soffits
PROJECT LOCATION:Grosvenor Square, London
CLIENT CONAUGHTS
DESCRIPTION OF WORK:

  • External Repair and Redecoration, Roofing Works and the Replacement of Cold Water Tanks, works commenced 15th July 2008.MADISON DECOR Ltd are delighted to have completed the above project which included surveys, repairs, redecoration, stone cleaning and water tank renewal. During the external decoration both scaffolding and power cradles were used. The roofing works included lead capping to bay roofs, asphalt works, pigeon spikes and solarflec cornices.Due to the prestigious location and challenging environment careful pre-inspection and planning was required to ensure a smooth programme delivery. Our Site Supervisor was responsible for quality control and liaison with residents and porters.

    All works were completed successfully on time with the final account at £158,000, £2,000 under budget.

CLIENT:Notting Hill Housing Association Europe
PROJECT LOCATION:Various Properties, Hammersmith & Fulham Area
DESCRIPTION OF WORK:

  • Redecorations to external and communal areas, including associated repairs, roofing remedial works and flooring replacement to various properties owned by Notting Hill Housing Association.On award of this arrangement a number of workshops were held to ensure the smooth running of the project.The workshops established a number of Key Performance Indicator’s by which the project is managed and performance measured. The Key Performance Indicator’s include resident satisfaction, defects, predictability, cost, safety and environmental issues.

    At the beginning of each year MADISON DECOR Ltd work closely with Axis Europe, Notting Hill HA and their consultants, Baily Garner, in carrying out surveys and finalising budgets.

CLIENT:Richmond Housing
PROJECT LOCATION:Various properties in West London
DESCRIPTION OF WORK:

  • External redecorations, pre-paint repairs, replacing asbestos soffits and fascias and re-decorating internal communal areas and applying fire upgrade paint systems where necessary.
CLIENT:Connaughts
DESCRIPTION OF WORK:

  • Externalpainting to the coffer ceilings using destemper and appling by destemper brushes as per traditional methods , all windows had to be chemically stripped and lead paint was applied as per origanal specificationInternal works comprised of decorations to coffer ceilings, cross lining to all internal walls and painted, mouldings chemically stripped and picked out in gold leave leaf. all woodwork was chemically stripped and painted in lead paint as per origal specifacation
CLIENT:Connaughts
PROJECT LOCATION:Portman Mansions & York Mansions W1
DESCRIPTION OF WORK:

  • External redecorations, pre-paint repairs, replacing asbestos soffits and fascia, EXTENSIVE CONCRETE REPAIRS TO BALCONIES INTERNALS, REMOVING ALL EXCISTING COATINGS re-decorating internal communal areas and applying fire upgrade Class O fire rating to all communal areas
CLIENT:Kilby Gayford Europe
PROJECT LOCATION:Oxford Saw Mill
DESCRIPTION OF WORK:

  • The external redecorations and associated repair works to the 15th century half timbered house including outbuildings comprising garden store, garage, stable block and gates.The works required a fully alarmed scaffold to be erected with consideration to the gardens and a colony of bats which had been identified.The works were carried out over a 16 week period during which the property remained open to the public

Concrete Repair

PROJECT:HSBC Bishops Stortford Herts
DESCRIPTION OF WORK:

  • The whole building required the brick and stone work to be repaired and re-pointed. All defective bricks were replaced, all old mortar raked out and re-pointed in lime mortar.The crumbling ballasters were carefully taken out, along with the defective ironwork and replaced with new stainless steel fixings and Stoke Ground ballasters. Cramping of copings with stainless steel fixtures. The chimney pots were replaced and flaunching to the top of the chimney stacks
PROJECT:Timber Repair and Restoration
DESCRIPTION OF WORK:

Damaged, decayed and structurally unsound timber can often be repaired and thus retained. This can have great benefits where this is of particular historic or aesthetic importance. Similarly, it may be of structural significance. Our repair techniques can be carried out usually with minimum disturbance to the surrounding structure, producing unobtrusive, long lasting and attractive results.

OUR SERVICES INCLUDE:

  • Flitch plate installation
  • Reinforced resin repair
  • Resin pinning
  • Like for like timber splicing and replacement
PROJECT:Stone & Masonry Repair and Restoration
DESCRIPTION OF WORK:
It is of vital importance to appreciate the impact of repair to any structure, and it is therefore crucial to not only to address the underlying cause but also to identify the most appropriate technique for repair to ensure that it is carried out in the most sympathetic manner, in order to best preserve and enhance the fabric.

WE OFFER THE FOLLOWING SERVICES:

  • Surveys and reports
  • CAD design
  • Design costing
  • Material sourcing
  • Stone carving
  • Banking and fixing
  • Component indenting and replacement
  • Cosmetic repair
  • De-scaling and re-dressing
  • Masonry cleaning
  • Mineral applications
  • Poultice treatments
  • Grit and sand blasting
  • Hard and soft mortar pointing
  • Graffiti removal and protective treatments/coatings
  • Stucco, render, terracotta, faience & terrazzo repair, restoration and replacement
PROJECT:Concrete Repair and Protection
DESCRIPTION OF WORK:

Whilst concrete is an excellent building material with many complex and variable uses, it can be prone to failure if not adequately constructed and maintained. Concrete can deteriorate and be problematic for a variety of reasons which are often the result of inadequate design and/or poor site practice as well as external environmental factors.

These faults can range from minor cracking and shrinkage, which can often be easily resolved, through to component failure which may involve a more complex and potentially major repair solution. We offer a wide variety of services which are suitable for any eventuality.

THESE INCLUDE:

  • Condition and diagnostic surveys
  • Costed repair options
  • Concrete repair
  • Crack repair and injection
  • Grouting
  • Carbon fibre plate bonding
  • Elastomeric coatings
  • Anti-carbonation and impregnation coatings
  • Cathodic protection
  • Epoxy coatings
  • Water stopping/leak injection
  • Joint sealing and replacement
PROJECT:Structural Repair
DESCRIPTION OF WORK:
The most successful structural repair project requires more than just a good contractor. It requires a diversity of expertise and specialist knowledge that has the capability to correctly identify any problems, specify the most appropriate and effective repair solution, whilst maintain an awareness of cost, programme and health and safety requirements.

WE OFFER THE FOLLOWING SERVICES:

  • Underpinning
  • Beam enhancement and strengthening
  • Plate bonding
  • Helical bar installations
  • Crack repair and stitching
  • Stabilisation
  • Structural alteration
  • Wall tie replacement
DESCRIPTION OF WORK:

MADISON DECOR Ltd offer a mobile sand and shot blasting service to remove the toughest coatings and deposits quickly and efficiently, using leading brand coatings and products.

Shot blasting is the method of preparing a surface for painting or coating, by removing surface contaminants.

We deliver the best in shot blast techniques and products, to ensure that any spray painting or protective coating work can be undertaken to high standards.

We can clean and shot blast materials including steel, sand, wood and concrete, and offer the latest in special coatings and intumescent paints (flame retardant) to all types of surface.

Shot blasting is conducted on metal structures where substantial rusting has occurred, and has started to penetrate the metal. This process will clean and also remove all traces of corrosion, while preventing the re-emergence of rust.

WE OFFER THE FOLLOWING SERVICES:

  • Roofing services Include
  • Tiling
  • Slating
  • Velux Windows
  • Guttering
  • Soffits & Fascias
  • Strip & Re-tiling
  • Roof Valeting
  • Leadwork & Flashings
DESCRIPTION OF WORK:

MADISON DECOR Ltd offer a mobile sand and shot blasting service to remove the toughest coatings and deposits quickly and efficiently, using leading brand coatings and products.

Shot blasting is the method of preparing a surface for painting or coating, by removing surface contaminants.

We deliver the best in shot blast techniques and products, to ensure that any spray painting or protective coating work can be undertaken to high standards.

We can clean and shot blast materials including steel, sand, wood and concrete, and offer the latest in special coatings and intumescent paints (flame retardant) to all types of surface.

Shot blasting is conducted on metal structures where substantial rusting has occurred, and has started to penetrate the metal. This process will clean and also remove all traces of corrosion, while preventing the re-emergence of rust.

WE OFFER THE FOLLOWING SERVICES:

  • Roofing services Include
  • Tiling
  • Slating
  • Velux Windows
  • Guttering
  • Soffits & Fascias
  • Strip & Re-tiling
  • Roof Valeting
  • Leadwork & Flashings
This 50,000sqft Jobcentre Plus scheme comprised a full office fit-out including new

PROJECT: Jobcentre Plus, Hounslow
CLIENT: Department for Work and Pensions
VALUE: £700,000.00
CONTRACT TYPE: PPC2000
CONTRACT PERIOD: 32 weeks
PROCURMENT ROUTE: TENDER

FELTHAM JOBCENTRE PLUS

The scope of this project included the removal of a spine wall; complete strip out; parapet wall work; extension to the roof plant; and full office fit out

PROJECT: Jobcentre Plus, Feltham
CLIENT: Department for Work and Pensions
VALUE: £650,000.00
CONTRACT TYPE: PPC2000
CONTRACT PERIOD: 34 weeks
PROCURMENT ROUTE: TENDER

ROYAL MAIL ROMFORD

PROJECT: Romford Delivery Office
CLIENT: Royal Mail
VALUE: £220,000.00
CONTRACT TYPE: IFC
CONTRACT PERIOD: 12 weeks
PROCURMENT ROUTE: TENDER

ROYAL MAIL E16

PROJECT: E16 Delivery Office
CLIENT: Royal Mail
VALUE: £0.6m
CONTRACT TYPE: JCT2005
CONTRACT PERIOD: 12 weeks
PROCURMENT ROUTE: Single stage competitive

SAINSBURY’S LOCAL, FULHAM BROADWAY

MADISON were contracted by Sainsbury’s to convert this “Central Store” Format in to their “Convenience Store” Format in as short a time as possible in order to minimise the impact on store trading. The complete refurbishment was delivered in less than 28 days.

PROJECT: Fulham Broadway Local
CLIENT: Sainsbury’s Supermarkets Ltd
VALUE: £200,000
CONTRACT TYPE: Sainsbury’s S60A
CONTRACT PERIOD: 4 weeks
PROCURMENT ROUTE: Negotiated

TESCO EXPRESS, WEST MERSEA

This project comprised the demolition of an existing petrol filling station, including land remediation and the construction of a new build Tesco Express Store. The project logistics were complicated by the fact that West Mersea Island is only accessible at low tide via a causeway.

PROJECT: West Mersea Express
CLIENT: Tesco
VALUE: £650k
CONTRACT TYPE: Tesco D&B
CONTRACT PERIOD: 18 weeks
PROCURMENT ROUTE: Negotiated

M&S SIMPLY FOOD, MAYBIRD RETAIL PARK

Having successfully won a place on the Marks and Spencer Simply Food framework, MADISON delivered their first scheme in Stratford Upon Avon. The project comprised the fit-out of a 12,000sqft retail park developer’s shell, complete with the creation of external plant space for the refrigeration equipment.

PROJECT: Maybird Simply Food
CLIENT: Marks and Spencer
VALUE: £1.1m
CONTRACT TYPE: JCT2005 D&B
CONTRACT PERIOD: 16 weeks
PROCURMENT ROUTE: Negotiated

CASTLE MILL, UNIVERSITY OF OXFORD
LIMITED PACKAGE VALUE: £2.6m

PROJECT DETAIL:
MADISON DÉCOR undertook the dry lining and suspended internal ceilings work, plus the through colour render system to the external blockwork on this development.

Two of the main blocks were set out on a curve, giving the MADISON site team challenges in setting out with very tight tolerances that were successfully achieved.

The curved design of the building produces the tapered shape of many of the apartments and allows more light to enter, creating more welcoming homes.

SOLIHULL RETAIL PARK

Full strip out, extension and re-cladding of existing retail units on the retail park. The work was completed across a number of phases with the retail park remaining live
throughout.

PROJECT: Solihull Retail Park
CLIENT: Standard Life
VALUE: £2.4m
CONTRACT TYPE: JCT2011D&B
CONTRACT PERIOD: 24 weeks
PROCURMENT ROUTE: Single Stage Competitive

BRETTON CENTRE, PETERBOROUGH

This project comprised the partial demolition of a shopping centre, and the construction and fit out of 38,360 sqft of non-food retail units including refurbishment of the existing shopping mall and associated infrastructure and external works.

PROJECT: Bretton Centre Retail Park, Peterborough
CLIENT: Catalyst Capital
VALUE: £2.1m
CONTRACT TYPE: JCT1998 D&B
CONTRACT PERIOD: 44 weeks
PROCURMENT ROUTE: Single stage competitive

VICTORIA RETAIL PARK

This project included the demolition and relocation of existing McDonalds to new unit along with the construction of three units at the existing Victoria Retail Park which remained fully operational throughout the project. The scheme includes a range of associated external works including landscaping and car parking provision.

PROJECT: Victoria Retail Park
CLIENT: Crown Estates
VALUE: £1.4 m
CONTRACT TYPE: JCT2011D&B
CONTRACT PERIOD: 32 weeks
PROCURMENT ROUTE: Single Stage Competitive

JUBILEE BUILDING

This project included the new build construction of a new Jubilee building. The building was constructed to highlight the types of renewable technologies available. Constructed to BREEAM Excellent standard. Madison carried out the full fit-out package

PROJECT: Jubilee
CLIENT: Longcross
VALUE: £800,000.00
CONTRACT TYPE: JCT2011
CONTRACT PERIOD: 36 weeks
PROCURMENT ROUTE: Tendered

DEPARTMENT OF INTERNATIONAL DEVELOPMENT, UNIVERSITY OF OXFORD

The scope of this project included the demolition of an existing extension and the construction of a new four-storey extension to the University’s Department of International Development primary building.

PROJECT: Queen Elizabeth House
CLIENT: Oxford University Estates Directorate
VALUE: £2.3m
CONTRACT TYPE: JCT2005 D&B
CONTRACT PERIOD: 48 weeks
PROCURMENT ROUTE: Tendered

SUTTON MCDONALD’S

The scope here comprised the replacement of the existing mansard roof, full fit out of the restaurant, new signage and a full external works package.

PROJECT: Sutton Mcdonald’s
VALUE: £800,000.00
CONTRACT PERIOD: 36 weeks
PROCURMENT ROUTE: Tendered

PIZZA HUT, SITTINGBOURNE

The scope here comprised the replacement of the existing mansard roof, full fit out of the restaurant, new signage and a full external works package.

PROJECT: Pizza Hut, Sittingbourne
VALUE: £500,000.00
CONTRACT PERIOD: 36 weeks
PROCURMENT ROUTE: Tendered

REDHILL MAGISTRATES COURT

This project involved the construction of a new first-floor extension to a live court house in a residential area and remodelling of both floors.

PROJECT: Redhill Magistrates Court
CLIENT: Her Majesty’s Court Service
VALUE: £0.8m
CONTRACT TYPE: JCT2011
CONTRACT PERIOD: 20 weeks
PROCURMENT ROUTE: Single stage competitive

OXFORD COMBINED COURTS

The scheme involved the design and build of a new second-floor extension to an existing flat roof area, including the installation of a new lift and steel staircase.

PROJECT: Extension to Oxford Combined Courts
CLIENT:Her Majesty’s Court Service
VALUE: £1.8m
CONTRACT TYPE: 42 weeks
PROCURMENT ROUTE: Single stage competitive

MARGEY ESTATE ISLINGTONCYCLICAL

Survey, design, cyclical decorations to the external building fabric including outbuildings and stores, internal communal areas, repairs and replacements including windows and doors, roofs, boundary walls and fencing, path and estate roads, asbestos removal and reinstatement works to communal areas, TOR Class O Upgrades to 13 No Blocks , TOR Deck to Balcony walkways

PROJECT: MARGEY Estate IslingtonCyclical Decorations & External Works Programme
CLIENT: Bryer Group Plc
VALUE: £860,000.00
CONTRACT PERIOD: 40 weeks

FAMILY MOSIAC CYCLICAL DECORATIONS & EXTERNAL WORKS PROGRAMME

Survey, design, cyclical decorations to the external building fabric including outbuildings and stores, internal communal areas, repairs and replacements including windows and doors, roofs, boundary walls and fencing, path and estate roads, asbestos removal and reinstatement works to communal areas, damp proofing, dry rot and mould treatment to communal areas.

Orders are raised over two stages. Stage One involves the survey, design, programming and pricing of works to generate a “Scope and Cost Template” (SACT) against the tendered Schedule of Rates. Stage Two involves the works delivery of the order with a strong focus on minimal variations against the SACT

PROJECT: Family Mosiac Cyclical Decorations & External Works Programme
CLIENT:Bryer Group Plc
VALUE: £4.5m per year
CONTRACT TYPE: 3 Years

LONDON AND QUADRANT HOUSING TRUST (L&Q)

Scope of Works Planned maintenance works includes; cyclical external painting (not seven year internal decorations), major aids and adaptations, major repairs, internal whole replacement works, including: kitchens, bathrooms central heating, electrical wiring, external works, including: structural works, roofing replacement, security works, windows, doors, communal lift replacement, environmental works

PROJECT: London and Quadrant Housing Trust (L&Q)
VALUE: £1.8m

CHERTSEY COURT MORTLAKE, SW14

One advantage of MADISON DECOR Ltd having a long term agreement with Lakehouse has an added incentive to deliver high quality work. Chertsey Court is the largest scheme carried out in 9 years of working with R.H.P.

All external decorations were carried out off Cherry-Pickers to reduce scaffold costs, Internal communal 30 Staircase were Class O Upgrades

PROJECT: Chertsey Court Mortlake, SW14
CLIENT:LakehouseFrame –Work
VALUE: £500,000.00
CONTRACT TYPE: 2014-2015

CAMDEN REGENERATION

Survey, design, Street Properties , cyclical decorations to the external building fabric including outbuildings and stores, internal communal areas, repairs and replacements including windows and doors, roofs, boundary walls and fencing, path and estate roads, asbestos removal and reinstatement works to communal areas
Improvements sheltered housing schemes refurbish all internals

Improvements included full internal refurbishment, modernised communal areas, Class O Upgrades and the installation of durable new flooring

PROJECT: Camden Regeneration
CLIENT:Keepmoat
VALUE: 2m per year